Skip to content
GitHub · Developer toolsMar 2, 2026, 23:10 UTC

Delayed visibility of newly added issues on project boards

MinorNot disclosedUpdated 37h ago
Mar 2, 23:10 UTCMar 3, 05:54 UTC
Duration
6h 44m
Impact
Minor
Root cause
Not disclosed
GitHub, 90 days
69 incidents
Affected
Not listed by the vendor.
Status page

Final update

Between March 2, 21:42 UTC and March 3, 05:54 UTC project board updates, including adding new issues, PRs, and draft items to boards, were delayed from 30 minutes to over 2 hours, as a large backlog of messages accumulated in the Projects data denormalization pipeline. The incident was caused by an anomalously large event that required longer processing time than expected. Processing this message exceeded the Kafka consumer heartbeat timeout, triggering repeated consumer group rebalances. As a result, the consumer group was unable to make forward progress, creating head-of-line blocking that delayed processing of subsequent project board updates. We mitigated the issue by deploying a targeted fix that safely bypassed the offending message and allowed normal message consumption to resume. Consumer group stability recovered at 04:10 UTC, after which the backlog began draining. All queued messages were fully processed by 05:53 UTC, returning project board updates to normal processing latency. We have identified several follow-up improvements to reduce the likelihood and impact of similar incidents in the future, including improved monitoring and alerting, as well as introducing limits

Timeline

  1. Resolved · Mar 3, 05:54 UTC
    Between March 2, 21:42 UTC and March 3, 05:54 UTC project board updates, including adding new issues, PRs, and draft items to boards, were delayed from 30 minutes to over 2 hours, as a large backlog of messages accumulated in the Projects data denormalization pipeline. The incident was caused by an anomalously large event that required longer processing time than expected. Processing this message exceeded the Kafka consumer heartbeat timeout, triggering repeated consumer group rebalances. As a result, the consumer group was unable to make forward progress, creating head-of-line blocking that delayed processing of subsequent project board updates. We mitigated the issue by deploying a targeted fix that safely bypassed the offending message and allowed normal message consumption to resume. Consumer group stability recovered at 04:10 UTC, after which the backlog began draining. All queued messages were fully processed by 05:53 UTC, returning project board updates to normal processing latency. We have identified several follow-up improvements to reduce the likelihood and impact of similar incidents in the future, including improved monitoring and alerting, as well as introducing limits for unusually large project events.

More from GitHub

Full history
StartedIncidentDuration
Sep 2416:51 UTCDisruption with billing information updates3h 50m
Sep 2310:11 UTCIncident across several services18h 44m
Sep 2022:13 UTCIncident with Pull Requests1h 9m
Sep 1720:59 UTCElevated rate of errors for OpenAI models provided by Copilot50m
Sep 1607:20 UTCDegradation with Gemini 3.8 Flash10h 28m
Sep 1519:11 UTCDisruption with some GitHub services49m

Sources: vendors' own status pages, published postmortems and SEC 8-K Item 1.05 filings, read daily. Times as reported. Logos via logo.dev; trademarks belong to their owners.

Outages by email

Saturday mornings: the week's major outages, new postmortems and disclosed breaches, only in weeks that had some.

Double opt-in. Unsubscribe any time.